Pressure equipment management
Regularisation, upgrading, inspections and technical planning in accordance with INAIL, Italian Legislative Decree 81/2008 and the PED/TPED regulations
Complete, certified management of pressure equipment and pressurised lines
STIGC supports industrial companies, utilities and production plants in the technical, documentary and inspection management of pressure equipment, ensuring regulatory compliance, operational safety and long-term reliability.
The aim is to relieve the employer of the various activities involved in managing, scheduling and regularising pressure equipment. The service covers everything required ahead of the certification and inspection of tanks, boilers and pressurised lines: we set the safety valves ourselves, carry out non-destructive testing on them, perform stability and remaining-life calculations, and handle relations with notified bodies and authorised parties as well as the updating of records on the CIVA portal.
The service covers the entire life cycle of pressurised systems:
1
LPG and non-LPG pressure tanks
2
Pressurised lines and pipework
3
Fixed and transportable pressure equipment
4
Safety valves, heat exchangers, vessels and plant accessories
Services offered
1. Regularisation and upgrading of pressurised systems
STIGC carries out technical regularisation and regulatory upgrading, which are essential when:
- the installation does not meet the regulations in force
- there are gaps in the documentation
- older or modified installations need to be brought into order
- the classification of the equipment needs updating
Activities included:
- Review of the equipment’s documentation status
- Alignment of the technical file
- Compliance with the requirements of PED, TPED, Italian Ministerial Decree 329/2004 and Italian Legislative Decree 81/2008
- Drafting and updating of data sheets, specifications and serial numbers
- Reorganisation of past declarations and inspection records
2. Declarations, commissioning and record alignment on CIVA
We handle all the mandatory formalities:
- Declaration of a pressurised installation
- Commissioning with INAIL
- Uploading and alignment of data on CIVA, the official platform for the management of pressure equipment
- Liaison with INAIL and notified bodies
- Updating of documentation after modifications and new installations
Result: an installation that is fully compliant and verifiable by the supervisory authorities.
3. Technical planning of deadlines and periodic inspections
STIGC manages the deadlines and schedules all inspection activities:
- Periodic inspections under art. 71 of Italian Legislative Decree 81/2008
- Safety valve setting
- Non-destructive testing (NDT): VT, PT, MT, UT, metallographic replicas
- Integrity checks and sample analysis
- Management of non-conformities and corrective measures
Thanks to our planning system, regulatory deadlines are monitored, flagged and managed on your behalf.
4. Condition assessment and remaining-life calculation
To assess the safety and reliability of tanks and pressurised lines, we carry out:
- Structural analysis using NDT techniques
- Thickness measurement and corrosion checks
- Mechanical analysis according to engineering criteria
- Remaining Life Assessment (RLA)
- Degradation curves and end-of-life projections
- Action plans based on how critical the installation is
This approach makes it possible to anticipate problems, prevent plant downtime and optimise maintenance costs.
Our strengths
Multidisciplinary expertise in pressure equipment
Experience with tanks, pipework, static equipment and safety accessories, covering the whole certification chain.
Full regulatory compliance
Aligned with PED, ADR, Italian Ministerial Decree 329/04, Italian Legislative Decree 81/2008 and UNI EN ISO 9712.
Full traceability of all work
Technical reports, certified records, up-to-date documentation.
Risk management and operational continuity
Less downtime, prevention of faults and improved reliability.
Ongoing specialist technical support
A single point of contact for industrial, chemical, energy and manufacturing companies.
Request a tailored quote
Reply within 24 hours, regulatory advice included.
Procedures, certifications and operating methods
Frequently asked questions about our services
PED, TPED, Italian Ministerial Decree 329/2004 and Italian Legislative Decree 81/2008 art. 71, including INAIL formalities and alignment with the CIVA platform.
Yes: it files the installation declaration, handles commissioning, uploads data to CIVA and liaises directly with INAIL and notified bodies.
Safety valve setting, non-destructive testing (VT, PT, MT, UT), thickness measurement, integrity analysis and the mandatory periodic inspections.
Yes: through Remaining Life Assessment (RLA), structural analysis, degradation curves and action plans based on how critical the installation is.