LPG cylinder requalification 10–62 kg

TPED certified service – complete reconditioning

Why choose STIGC for ten-year requalification

Technical strengths:

How requalification works: the certified stages of the process

Stage 1

Storage and identification of incoming material

• Cylinders received in metal cages
• Identification following our internal procedure
• Empty, purged cylinders → outside the scope of ADR (art. 4.1.6.10)
• Storage in a covered, protected and segregated area

Stage 2

Purging and cleaning

Removal of residues, dirt and impurities so the cylinder is fit for the testing stage.

Stage 3

Certified hydraulic test + visual testing + ultrasonic examination

Process compliant with UNI EN 1440 and TPED.

Hydraulic test:
• Five cylinders tested simultaneously
• Pressure: 30 bar
• Tightness and structural integrity checked
• Non-compliant cylinders: decommissioned by perforation

Visual testing (VT):
• Before and after sandblasting
• Carried out by personnel certified to UNI EN ISO 9712
• Analysis of surface and structural defects

Ultrasonics (UT) – thickness measurement:
• Assessment of remaining wall thickness
• Detection of corrosion and defects not visible to the eye
• Determination of residual mechanical strength

Stage 4

Sandblasting (Sa2 – ISO 8501-1)

Complete removal of the previous coating using:
• An in-line tunnel blasting machine, or
• An off-line cluster blasting machine
This leaves a clean surface for accurate inspection and optimal coating.

Stage 5

Structural maintenance of the cylinder

Permitted operations:
• Replacement of the collar and foot ring
• Straightening of deformed components
• Repair of pitting or dents
• Restoration of repairable cylinders after the hydraulic test
• Welding with basic electrodes under qualified procedures

Stage 6

Powder coating + curing in a static oven

Automated cycle:
• Application of thermosetting powders
• Controlled curing
• Automatic unloading tower
Benefits:
• High adhesion
• Mechanical strength and corrosion resistance
• Even, durable finish

Stage 7

Valve replacement and fitting

Using a certified automatic machine:
• Removal of the existing valve
• Thread inspection (visual plus taper gauge)
• Application of sealing compound
• Fitting of the new valve

Stage 8

Certified weighing + laser marking

• Tare calibration on an Accredia certified scale
• Application of the test disc showing year and tare
• Automatic recording through our own software
• ADR compliant laser marking

Stage 9

TPED certification / former Ministerial Decree 18.06.2015

Issue of the periodic inspection certificate:
• Digital and paper versions
• Validity set by the standards
• Compliant with TPED, ADR and Ministerial Decree 12.09.1925

Stage 10

Reporting and traceability

For every batch we produce:
• A register of tested cylinders
• Test results
• Certificates of conformity
• A register of rejects with the technical reasons

Stage 11

Final storage and preparation for delivery

• Automatic palletising
• Dedicated outdoor area
• Logistics arranged for client collection

Concrete benefits for the client

1

Lower operating costs

Avoids replacing cylinders early

2

Full regulatory compliance

3

Fast turnaround

Thanks to the industrialised process

4

High repeatability and consistent quality

5

In-house certification

Shorter lead times

6

Full batch traceability

Reference standards

Request a tailored quote

Reply within 24 hours, regulatory advice included.

Procedures, certifications and how we work

Frequently asked questions about our services

Every 10 years, under TPED and UNI EN 1440.

Yes, provided they fall within the repairability criteria set by UNI EN 1440 and the applicable structural requirements.

Yes, through our certified Internal Surveillance System (Eurofins).

Yes, the service covers every size from 10 to 62 kg.