Safety valve setting and maintenance

Certified inspections, setting and maintenance for industrial plants and pressure equipment

Setting methods available

STIGC works with two complementary technical systems, suitable for valves either installed or removed.

1. Setting on a certified bench (bench test)

Carried out at our specialised facility, it allows:

  • setting with inert gas (nitrogen) at the specified pressure
  • precise measurement of the opening and reseating values
  • inspection of the mechanical condition of the valve
  • issue of INAIL certification where required

Advantages:
high precision
complete off-line testing
immediate certification
suitable for scheduled maintenance

2. On-site setting with PRE-VENTIL / PreVenTest

A technology suited to setting valves in place, with no need to shut the plant down completely.

  • Verification of the opening point (set pressure)
  • Setting without removing the valve
  • Documented test with technical certification
  • Shorter downtime and lower operating costs

Advantages:
ideal for live plants
no prolonged interruption of operation
maximum speed and reliability
lower risk of improper handling

Safety valve maintenance services

In addition to setting, STIGC performs:

The work is carried out by qualified technicians with expertise in the management of pressure equipment.

Reference standards

The STIGC service complies with the main standards of the sector:

1

UNI EN ISO 4126

safety valves

2

UNI EN 12266

bench testing

3

UNI EN 13445

unfired pressure vessels

4

Italian Ministerial Decree 329/2004

5

Italian Legislative Decree 81/2008 – art. 71

(periodic inspections)

6

INAIL guidelines

Procedures for pressure equipment

7

Directive 2014/68/EU (PED)

Pressure equipment

Fields of application

Safety valve setting and maintenance applies to:

Why choose STIGC

Two setting methods (on the bench and on site)

Total flexibility for every plant.

Complete certification and traceability

Every setting is recorded and accompanied by technical documentation.

Qualified technicians and certified instruments

Proven expertise in handling critical equipment and devices.

Speed and operational continuity

Scheduled work with minimum interruption to processes.

Request a tailored quote

Reply within 24 hours, regulatory advice included.

Procedures, certifications and operating methods

Frequently asked questions about our services

In accordance with Italian Legislative Decree 81/2008 art. 71 and INAIL requirements, at intervals defined by the type of equipment and its operating conditions.

Yes, using the PreVenTest system on site, verifying the opening point without shutting the plant down completely.

Yes: the bench test with inert gas allows precise measurement of the opening/closing values and the issue of INAIL technical certification where required.

Yes: it includes inspection, internal cleaning, checks on springs and seals, replacement of worn parts and a final certified resetting.

Living under under pressure